So the day had finally come. Time to put the crane into the shed. For the last few days have been straightening the crane rails and making sure they are parallel and exactly 10.970 m apart. Eventually all 112 hook bolts are in and tightened and I'm happy its as good as I can make it.
The plan was to get the 35 tonne crane to lift the big planer off the truck first. At 14 tonne for the planer bed alone and with not much room it was always going to be tight. Had to make some lifting bars and collars as the crane company didn't have any!
The last few days have had some sleepless nights about all the things that could go wrong. It won't fit (even though I had measured it many times) or we drop something or we lose control and it crashes into the shed. So in some ways it was nice that the day had finally come.
Best to just let the pictures do the talking
IMG_2375.jpg
IMG_2377.jpg
IMG_2381.jpg
IMG_2386.jpg
IMG_2387.jpg
IMG_2398.jpg
IMG_2400.jpg
IMG_2403.jpg
Sorry some of the pictures are on there side but I don't know how to fix that.
Anyway all went smoothly and the crane fitted perfectly.
Tried to move the planer to its final position with the 12 tonne forklift but that was a no go so will skate it into position tomorrow. I finally think I'm over the worst and mostly down hill from here
Mark
-
25th May 2020, 08:22 PM #167Most Valued Member
- Join Date
- May 2011
- Location
- Murray Bridge S Aust.
- Age
- 71
- Posts
- 5,959
Glad to see that the end is insight for you. Now all that's needed is the rest of the roof and some doors, hope that the weather is calm for those few days to do them.
KrynTo grow old is mandatory, growing up is optional.
-
25th May 2020, 09:03 PM #168Golden Member
- Join Date
- Mar 2012
- Location
- Western NSW
- Posts
- 543
Thanks Kryn
I have actually taken 2 weeks off to try and break the back of it. Once I move the planer can start on the last bay of the roof. Then the remaining side wall and walkway between the two sheds. Will have to move some of the bigger machines in before doing the end wall and door. Getting close though.
Mark
-
26th May 2020, 12:54 AM #169
Wow what a accomplishment, I remember you buying the planner and the crane.
CongratulationsUsing Tapatalk
-
26th May 2020, 08:35 AM #170Golden Member
- Join Date
- Mar 2012
- Location
- Western NSW
- Posts
- 543
-
26th May 2020, 04:02 PM #171Senior Member
- Join Date
- Feb 2009
- Location
- jilliby nsw
- Age
- 71
- Posts
- 111
Been watching the build Mark, what a fantastic effort, well done. Cant wait to see the shed finished and all the "toys" installed. Congratulations
-
26th May 2020, 09:37 PM #172Golden Member
- Join Date
- Mar 2012
- Location
- Western NSW
- Posts
- 543
Thanks.
Skated the planer into position today and moved in the first SIP jig borer. Will hopefully finish the roof this week then will move in the slideway grinder and the mitsui seiki borer. I need to move them into place before the end wall goes in. They have been under covers for a long time so looking forward to them seeing the light of day.
Once the shed is finished I will try to profile some of the more interesting machines ( jig borers,Moore jig grinder, circular and linear dividing engines,planers,Churchill slideway grinder etc). For those those who are as interested in vintage machining and measurement as me, I hope some might find it interesting.
Will post more build photos as I go
Mark
-
26th May 2020, 10:14 PM #173
Hi Mark,
Looking forward to seeing it all together.
Not sure if I've missed it, but are you going to make a business out of machining/grinding machines etc etc?
I don't need any work done but was just interested in your long term goal with all these great huge machines.Using Tapatalk
-
26th May 2020, 11:32 PM #174Intermediate Member
- Join Date
- Aug 2009
- Location
- Lara, Vic, Oz
- Posts
- 46
Thanks Mark, have watched your progress throughout, and been super impressed, and yes would love to see more details of all of your gear! Planers and jig borers! Super interested! Very impressed with your work, and thanks for sharing.
-
27th May 2020, 08:30 AM #175Golden Member
- Join Date
- Mar 2012
- Location
- Western NSW
- Posts
- 543
Hi Dave
Not looking to start a business. This will be my retirement hobby. Have some large stationary engines, tractors and vintage engineering equipment to restore over the coming years. It’s just been a bit of a passion for a few decades and I somewhat naively thought ‘how hard can it be to build a proper shed for all these machines’ . I have now answered that question.....hard and expensive. But once finished it will be a great space to work in.
Cheers
Mark
-
27th May 2020, 09:07 AM #176Pink 10EE owner
- Join Date
- Aug 2008
- Location
- near Rockhampton
- Posts
- 6,218
Looks like a really good job of the shed, however I have discovered a serious flaw in the photo's. It is not big enough, because I have found, after awhile they never are.
Gold, the colour of choice for the discerning person.
-
27th May 2020, 01:35 PM #177Golden Member
- Join Date
- Mar 2012
- Location
- Western NSW
- Posts
- 543
-
28th May 2020, 06:12 PM #178future machinist
- Join Date
- Mar 2008
- Location
- nowra
- Posts
- 1,598
Wow Mark that's definitely an accomplishment I love it.
How the years fly by, I remember back in 2017 you letting me tag along with that adventure it's a great memory. I will have to come visit when the slide way grinders grinding.BETTER TO HAVE TOOLS YOU DON'T NEED THAN TO NEED TOOLS YOU DON'T HAVE
Andre
-
3rd Jul 2020, 06:05 PM #179Golden Member
- Join Date
- Mar 2012
- Location
- Western NSW
- Posts
- 543
Time for a shed update. have been working hard trying to get the shed finished.
IMG_2426.jpg Finally got the roof over the last bay. Its a great feeling when you can finally get down off the roof!!
IMG_2428.jpg
IMG_2429.jpg
IMG_2430.jpg Then it was time to make the beam for the sliding door to hang off. The door is roughly 5m x 5m so pretty heavy. I had some thick walled 150 x 100mm RHS hanging around so used that. I wanted it to be as dust proof as possible so it became a bit more complicated than normal but worked out well in the end.
Cheers
Mark
-
3rd Jul 2020, 06:13 PM #180Golden Member
- Join Date
- Mar 2012
- Location
- Western NSW
- Posts
- 543
Wanted to move a few machines in before I closed in the end wall. Had to move the slotter and baby Kearns borer so I could get to the Churchill slideway grinder and Mitsui seiki jig borer first. A slow and delicate process.
IMG_2431.jpg
IMG_2433.jpg
IMG_2434.jpg Only took one photo of loading the slideway grinder because I was a tad nervous. But Franna loaded it easy.
Mark
Similar Threads
-
what would be a better project
By welder in forum METALWORK GENERALReplies: 58Last Post: 26th Jun 2012, 06:22 PM -
A shed Hi Fi project
By Graziano in forum METALWORK GENERALReplies: 17Last Post: 3rd Apr 2012, 12:09 PM -
your latest project
By krisfarm in forum METALWORK GENERALReplies: 9Last Post: 10th Feb 2012, 04:53 PM -
Project #2
By jackaroo in forum METALWORK GENERALReplies: 6Last Post: 3rd Dec 2007, 06:45 AM -
Shed Heater Project (warning-large pics)
By Plushy in forum METALWORK GENERALReplies: 34Last Post: 20th Jul 2007, 11:32 PM