Results 1 to 2 of 2
  1. #1
    Join Date
    May 2018
    Location
    Cairns, Qld.
    Posts
    70

    Default Sheraton C Rebuild

    Further progress;
    Reduction gearing, as it was; (Mud wasps everywhere, light rust, seized bushes & general neglect).

    Reduction gearing 2 @ 40%.jpg


    Recently; with a bit more to go...

    Reduction gears 2 @ 40%.jpg

    Carriage & slides, as was; (Poor paint condition, surface corrosion, blocked oil-ways, generally in need of a thorough clean & check over of every component).

    Carriage & slides 2 @ 40%.jpg

    As of a few days ago - minimal wear evident on the important items. Has cleaned-up quite well.
    Carriage & slides rebuild 2 @ 40%.jpg Carriage & slides rebuild 1 @ 40%.jpg Carriage on bed 1 @ 40%.jpg
    Last edited by Halifax614; 30th Aug 2020 at 03:06 PM. Reason: Add more comments

  2. #2
    Join Date
    Feb 2014
    Location
    Werribee, Melbourne
    Posts
    177

    Default

    Wow, some elbow grease has been expended there. Nice work.

Similar Threads

  1. Sheraton C rebuild
    By Halifax614 in forum SHERATON AREA
    Replies: 0
    Last Post: 9th Aug 2020, 07:20 PM
  2. Hercus +rebuild with DRO
    By NickMortimer in forum THE HERCUS AREA
    Replies: 8
    Last Post: 17th Jun 2016, 09:14 AM
  3. Trailer rebuild
    By artme in forum TRAILERS & OTHER FABRICATED STUFF
    Replies: 3
    Last Post: 29th Jan 2012, 11:15 PM
  4. 9" rebuild
    By 12bolts in forum THE HERCUS AREA
    Replies: 2
    Last Post: 20th Jan 2012, 07:38 AM
  5. Hercus rebuild
    By Big Shed in forum THE HERCUS AREA
    Replies: 1
    Last Post: 10th Sep 2009, 01:56 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •