Mike4
3rd Feb 2016, 09:23 AM
I find that the same creeks cut the road even after so called upgrades have been completed .
Does anyone know why the so called design engineers do not raise the roadways above the highest levels which are normally encountered , only 1.2m most of the time .
This would then allow traffic to move normally after and during wet weather , instead we are all expected to sit around twiddling our thumbs or whatever .
Michael
Does anyone know why the so called design engineers do not raise the roadways above the highest levels which are normally encountered , only 1.2m most of the time .
This would then allow traffic to move normally after and during wet weather , instead we are all expected to sit around twiddling our thumbs or whatever .
Michael